What this checklist is for

I'm the office administrator for a mid-sized aggregate operation. I manage all parts and consumables ordering — roughly $450,000 annually spread across crusher spares, conveyor parts, and maintenance consumables. It's not a huge volume. One wrong part, though, and we've got a 300-horsepower cone sitting idle for a week.

This checklist is what I use whenever an order for Nordberg HP300 crusher parts crosses my desk — liners, bowls, mantles, eccentric bushings, seals, main shafts, frame guards. Seven steps. About 10–15 minutes if I'm organized. I didn't write it in a vacuum. Every step exists because of something that went wrong.

If you're short on time, skip ahead to whatever step matters for your order. Just don't skip Step 1 or Step 6.

Step 1: Start with the serial number, not the part name

The very first mistake I made — back in 2021, when I inherited parts purchasing — was calling a supplier and saying "I need a [part]," using the common name.

Problem is, Nordberg HP300 is a 300-horsepower class cone crusher model. It is not a unique identifier for any specific part. The same common name — "bowl liner," "mantle" — can map to several different part numbers depending on which machine sub-variant you have and which production year it came from.

So the sequence looks like this:

  • Find the serial number on the machine's nameplate — usually on the frame or base.
  • Match that serial number to the correct revision of the HP300 parts manual. Manuals are issued by serial number range.
  • Confirm back with your supplier that your manual revision matches theirs.

I keep each machine's serial number and manual revision in my purchasing files, so I don't have to walk out to the yard every time. That habit alone cut 1–2 business days off my order cycle. Not huge, but it adds up.

Step 2: Translate the "name" into a "part number plus configuration"

This is where most errors happen — the gap between what you call a part and what the machine actually calls it.

The key detail: part numbers carry configuration information — material, cavity profile, liner thickness. To give you an example, the same common name "liner" can have separate part numbers for the coarse and fine cavity, and again for different alloy materials. The manual assigns a unique part number to each configuration.

My rule: verify the digit count and format of the part number against the manual before moving forward. If the quote from your supplier lists only a common name — "bowl liner," "mantle" — without a part number, send it back.

Walking you through her process step by step. Sounds fussy. But it's saved me from at least two wrong shipments.

Step 3: Decide OEM versus aftermarket — and put it in writing

Most people skim this part. My advice is to stop and think about it deliberately.

For context: the Nordberg brand sits under Metso today — it came in through Metso's 2001 acquisition of Svedala. There's a large market of third-party aftermarket replacement parts. They're not automatically wrong — but you need a position on them.

Here's what I've settled on:

  • Lifecycle-critical parts (main shaft, eccentric bushing): go OEM.
  • Non-critical parts (seals, fasteners): aftermarket is on the table, provided the supplier can hand over dimensional and material equivalence documentation.

Whichever you choose, write it into the purchase order. If something goes wrong, the PO is your evidence.

Step 4: Verify quantity, material, and cavity configuration

Even with the right part number, a wrong quantity or wrong configuration still causes problems.

My three-line check at this stage:

  1. Quantity — against this job's actual requirement, not against last month's order.
  2. Material or coating — based on the operating condition, don't copy the previous order's configuration.
  3. Cavity profile — coarse, medium, fine are not interchangeable.

On the quantity point — one of my early mistakes was copying the quantity from an order a month earlier. The liners on that job wore faster than expected, and the quantity ran short three weeks ahead of replacement time. The extra stock didn't go to waste, but it nearly cost us a shutdown window. Since then I've had a rule: quantity based on this cycle's actual wear pattern, not history.

Step 5: Nail down the lead time and the shipping method

Part number, configuration, and quantity all correct — and the delivery date can still be wrong. That's not unusual.

For HP300 spares, imported parts and locally stocked parts have dramatically different lead times. So before placing an order, I confirm:

  • In stock, or scheduled for production?
  • Shipping method and estimated arrival time once it leaves the factory.
  • If scheduled: the production start and completion dates.

You don't need a lot of detail here — but you need a number. A verbal "we'll ship ASAP" is worthless on the day you're replacing a liner.

Step 6: Confirm invoice, documentation, and warranty terms — the step most people skip

This is the one I stress the hardest, and the one that technically-minded colleagues most often gloss over.

The reason is simple. A few years ago I went with a cheaper quote from a new supplier for a batch of spares. The parts themselves were fine — but they could only issue a handwritten receipt, no proper invoice. Finance rejected the expense report outright. I ate that cost out of the department budget. Since then I have a rule: before placing any order, confirm the supplier can produce compliant invoicing and documentation.

So my Step 6 checklist:

  • Can they issue a proper invoice — not a receipt, an invoice?
  • Do the PO number, part number, and quantity on the invoice match the order?
  • Warranty terms — what's covered, for how long, and under what conditions?
  • Packing list and material certificates — will those be included?

Ask these before the order ships, not after it arrives. Warranty is the big one — if you find out at delivery that the warranty started on the factory ship date and the goods sat in inventory for six months, you've effectively bought nothing.

Step 7: Inspect on arrival — same day, before anything moves to the warehouse

When the goods land, don't move them straight into storage.

Same-day checklist:

  • Part number — cross-check the quote, the manual, and the PO.
  • Quantity — count it by box.
  • Visual condition — transit damage, casting defects, dings.
  • Warranty and invoice — filed, and anything missing is flagged.

If those don't line up, the goods don't go into inventory. It sounds strict, but it turns "return and replace" from a month-long headache into a same-day resolution.

Common mistakes to watch for

A few pitfalls I've either stepped into or watched others step into:

  • Reading a part number from memory over the phone. One time in ten it's wrong — and that one time hurts.
  • Copying part numbers from an old quote. Manuals get revised. Old numbers can be superseded.
  • Comparing quotes without aligning warranty terms. The cheaper quote can lose on warranty.
  • Skipping the serial-number match. If the manual revision is wrong, every part number check downstream is wasted.
  • Waiting until delivery to check invoicing. Once finance gets involved, the reimbursement cycle slips.

Five extra minutes of verification beats five days of rework. On a shutdown, the biggest cost is never the part itself. It's the days the machine sits there doing nothing.

So — get the serial number, pull the manual, verify the part number, confirm the invoice and warranty terms, and then place the order. It's not a complicated process. But what it saves you is the entire production line's time.

Air Products article author portrait

Mateo Quintana

Air Products editorial contributors translate industrial power trends into operating guidance that engineering, procurement, and site leadership teams can use in real project decisions.

Continue The Conversation

If this topic connects to an active project or a planned technology transition, use the inquiry form below and our team will route the discussion to the right engineering contact.

More reading from the Air Products insight library